Modernizing older photovoltaic systems or those that have lost effectiveness, improving their efficiency and restoring their initial performance.
Drawings, technical reports and authorization process needed to obtain the Authorization to start the construction.
Contractualization of all the land owners involved into authotization process, according to the rent indications provided by the investor.
Assessment of costs to start development and accurate evaluation of economical returns, related to the producibility of the renewable sources chosen.
Complete collection and assessment of local legislations: administrative, bureaucratic, related to the Grid Network, etc. Identification of infrastructures (roads, electricals network, etc…).
Preliminary studies: analysis of environmental and cultural heritage constraints. Identification and study of suitable area to use.